Kratos Energy
Kratos Energy
1300 089 547Design My Solar Plan
Baulkham Hills · NSW 2153

Solar panels in Baulkham Hills

Solar packages, batteries and EV chargers for Baulkham Hills, Norwest and Winston Hills — the whole 2153 postcode. Big established roofs, mature trees and a lot of ageing first-generation systems: we assess all three for free and lodge your grid-connection application.

  • 6.6kW systems starting from $7,410 (battery prices start from $4,290)
  • Two-storey access and tree shade priced in before you commit
  • Old 1.5kW systems removed, recycled and replaced
Read our customer reviewsCEC-accredited installers

Get a free Baulkham Hills quote

Your information is 100% secure and never shared.

Solar in Baulkham Hills at a glance

STC Zone 3
Postcode 2153 sits in Zone 3 (rating 1.382), which sets your rebate
Network approval
We lodge your grid-connection application and confirm your export limit
4.1 kWh
Average daily output per kW of panels in the Sydney region
The Hills Shire Council
Exempt development for most houses — parts of Winston Hills sit in Parramatta
Solar prices in Baulkham Hills

What solar costs in Baulkham Hills

These are estimated starting prices, not fixed quotes. Each package starts from the figure shown for a straightforward installation and already has the federal STC discount for postcode 2153 taken off. What your home actually costs depends on your roof, switchboard and connection — we confirm it in writing after a free assessment.

6.6kW

Just right for most family homes

Estimated starting price
Starts from $7,410
Battery prices start from $4,290
or from around $11/day over 24 months
STC discount included
45 STCs ≈ $1,710
Estimated savings
$1,800 a year
  • 475W Tier 1 solar panels
  • 5kW power inverter
  • 14 × 475W panels
See the 6.6kW system
Most popular

10kW

Medium homes & small businesses

Estimated starting price
Starts from $10,300
Battery prices start from $4,290
or from around $15/day over 24 months
STC discount included
69 STCs ≈ $2,622
Estimated savings
$2,310 a year
  • 475W Tier 1 solar panels
  • 8–10kW power inverter
  • 21 × 475W panels
See the 10kW system

13.2kW

Larger homes & small businesses

Estimated starting price
Starts from $11,250
Battery prices start from $4,290
or from around $16/day over 24 months
STC discount included
91 STCs ≈ $3,458
Estimated savings
$2,900 a year
  • 475W Tier 1 solar panels
  • 10kW power inverter
  • 28 × 475W panels (13.3kW)
See the 13.2kW system

Included in every Baulkham Hills install

  • 475W Tier 1 solar panels
  • System design and engineering
  • CEC-accredited installation
  • Grid-connection application lodged
  • Wi-Fi production monitoring
  • Export limit confirmed in writing

What can change your estimate

  • Two-storey or steep roofs
  • Roof type, such as Klip-Lok or terracotta
  • A switchboard upgrade
  • Three-phase connection
  • Panels split across several roof faces
  • An export limit on your connection

Anything that applies to your home is itemised in your written quote before you commit to it.

Prices start from the figures above, fully installed net payable after the federal STC rebate and including GST for metro areas (regional areas subject to freight and travel costs; T&Cs apply). Checked September 2026. STC figures use postcode 2153, 2026 deeming and an assumed $38 per certificate — the discount you receive depends on the certificate market on your installation date. Savings are modelled on typical usage and tariffs and are not a guarantee.

Grid connection

What you can export in Baulkham Hills

Your distribution network — not your retailer — decides how much solar your Baulkham Hills home may send back to the grid. The flexible export offer is changing this year, and because it applies to upgraded systems as well as new ones, it matters to the many Baulkham Hills roofs carrying a system from the early 2010s.

10kW per phase

Flexible exports: eligible customers can export up to 10kW per phase most of the time, with the inverter adjusting automatically when the local network needs it to. On a three-phase home that is a large allowance.

1.5kW

The fixed alternative: choosing a fixed export limit instead caps exports at 1.5kW.

From November 2026

Flexible exports become the default connection option for eligible new and upgraded solar systems.

Replacing a Solar Bonus Scheme-era system

The NSW Solar Bonus Scheme, which paid a gross feed-in tariff, closed on 31 December 2016 — so a system installed under it now earns an ordinary retailer rate, and upgrading cannot cost you a tariff you no longer receive. What does change is the connection: your network treats a replacement as an upgraded system, which brings it under the current export rules. We lodge that application and tell you the limit before anything is taken off your roof.

Network rules change and every connection is approved on its own merits — we confirm the limit that applies to your address in writing before install day.

Batteries

Adding a battery in Baulkham Hills

Home batteries attract two separate incentives. The federal Cheaper Home Batteries Program takes an estimated $3,402 off a 13.5 kWh battery, and NSW’s NSW VPP connection incentive (battery via federal program) can add more on top. Battery prices start from $4,290 fully installed after rebates (incl. GST for metro areas; regional areas subject to freight and travel costs). Already have solar? We check your inverter first — some systems take a battery as they are, others need a hybrid inverter.

≈ $3,402

Estimated federal rebate on 13.5 kWh of usable storage

+ NSW

NSW virtual power plant (VPP) incentive when you connect an eligible battery to a VPP, on top of the federal Cheaper Home Batteries discount. The NSW upfront battery discount ended for installs from 1 July 2025.

Planning an EV?

Size your solar for it now. Our 10kW package comes pre-wired for a battery and an EV charger, so adding one later is a small job rather than a rebuild.

From quote to switch-on

How a Baulkham Hills install works

  1. Step 1

    Free assessment

    We review your roof, shading, switchboard and a recent power bill — including how your trees shade the roof through winter, not just on the day we visit.

  2. Step 2

    Written quote

    A quote with the panel layout, inverter and every extra itemised. On a two-storey home that includes the access equipment, so it is priced before you commit rather than raised on install day.

  3. Step 3

    Network approval

    We lodge your grid-connection application and confirm your export limit before install day. Replacing an existing system counts as an upgrade, and we handle that paperwork the same way.

  4. Step 4

    Installation

    CEC-accredited electricians install, test and commission the system, then clean up. Old panels and inverters from a system we replace are taken away and recycled.

  5. Step 5

    Switch-on

    Your retailer updates the meter and we set up monitoring so you can see every kWh.

Our work

Solar systems we have installed

Every install below is a real Kratos job, with the suburb and month it was completed. As we finish work around Baulkham Hills, those projects will appear here too.

Kratos Energy’s 5 MW Solar Project in South Australia — South Australia
South AustraliaNov 2026

Kratos Energy’s 5 MW Solar Project in South Australia

Kratos Energy’s 5 MW solar project in South Australia showcases renewable energy infrastructure at scale. Featuring ground-mounted solar arrays and dedicated electrical infrastructure, the project forms part of our commitment to developing large-scale solar opportunities across Australia. The project photographs offer a closer look at the installation—from rows of solar panels to the supporting structures, cabling and electrical equipment behind the system. Project at a Glance Project detail Overview Location South Australia Capacity 5 MW Project category Large-scale solar Installation type Ground-mounted solar photovoltaic system Featured infrastructure Solar arrays, mounting structures, electrical equipment and control panels A Closer Look at the Solar Installation The site features rows of elevated solar panels arranged across open land, with access routes between sections of the installation. Ground-mounted systems allow the array layout to be planned around the site’s terrain, available space and maintenance requirements. The photographs also show the underside of the arrays, including structural supports and cable routing. These less-visible components are an essential part of a solar installation, alongside the panels themselves. Dedicated electrical enclosures and control equipment highlight the infrastructure required to support a project of this scale. Together, the images provide a practical view of the engineering involved in a large-scale solar site. Large-Scale Solar Expertise A solar farm requires coordination across site assessment, engineering, equipment selection, construction and network requirements. Kratos Energy’s large-scale solar services cover solar farm development, engineering and construction support, grid connection coordination, and operational support. We work with landowners, investors and commercial partners to assess opportunities and progress renewable energy projects. Explore our project portfolio to discover more of our solar and battery installations. Discuss Your Next Solar Project Have land suitable for solar development, a commercial energy requirement or a renewable energy project in mind? Contact Kratos Energy to discuss your site, objectives and potential next steps. Call 1300 089 547

What our customers say

“Kratos Energy completed our solar system seamlessly, and we are very satisfied with the entire process and results. They offered a very reasonable price for the same products and services compared to other providers. A special mention to Nessar, who worked hard and efficiently throughout the process. Highly recommended to future customers.”
Alan Gui · Google review
“Highly appreciated and recommended. As a customer, you can deal directly with Nessar Khan and his team, ask questions, and receive clear answers for complete peace of mind. Thank you to Nessar and the team.”
Saleem Muhammad · Google review
Read all reviews
Questions

Baulkham Hills solar questions

How much do solar panels cost in Baulkham Hills?

What solar rebate can I get in Baulkham Hills (2153)?

Is it worth replacing a 1.5kW system from the Solar Bonus Scheme era?

Who approves a solar connection in Baulkham Hills?

What is the NSW Emergency Backstop Mechanism, and does it affect me?

Will the trees on my block make solar not worth it?

Do I need council approval for solar in Baulkham Hills?

Solar near Baulkham Hills

We install across Hills District and the wider NSW service area, including Norwest, Winston Hills.

Get your free solar quote in under 2 minutes.

Tell us a little about your place and we’ll tailor the numbers. Everything in the list below is included, no exceptions.

Free consultation & designNo pushy sales tacticsTransparent pricing25-year warrantyProfessional installation
1300 089 547 [email protected]Serving NSW, Victoria & ACT

Get Your Free Quote

Your information is 100% secure and never shared.