Kratos Energy
Kratos Energy
1300 089 547Design My Solar Plan
Bossley Park · NSW 2176

Solar panels in Bossley Park

Solar packages, batteries and EV chargers for Bossley Park, Edensor Park, St Johns Park, Abbotsbury, Greenfield Park and Wakeley — the whole 2176 postcode. Big households, big roofs and a lot of second dwellings out the back: we size the system from your bill and check the metering before we design anything.

  • 6.6kW systems starting from $7,410 (battery prices start from $4,290)
  • Granny flats covered — once we have checked how they are metered
  • Tile roofs lifted and flashed, never drilled through
Read our customer reviewsCEC-accredited installers

Get a free Bossley Park quote

Your information is 100% secure and never shared.

Solar in Bossley Park at a glance

STC Zone 3
Postcode 2176 sits in Zone 3 (rating 1.382), which sets your rebate
Network approval
We lodge your grid-connection application and confirm your export limit
4.1 kWh
Average daily output per kW of panels in the Sydney region
Fairfield City Council
Most rooftop solar here needs no council approval, granny flats included
Solar prices in Bossley Park

What solar costs in Bossley Park

These are estimated starting prices, not fixed quotes. Each package starts from the figure shown for a straightforward installation and already has the federal STC discount for postcode 2176 taken off. What your home actually costs depends on your roof, switchboard and connection — we confirm it in writing after a free assessment.

6.6kW

Just right for most family homes

Estimated starting price
Starts from $7,410
Battery prices start from $4,290
or from around $11/day over 24 months
STC discount included
45 STCs ≈ $1,710
Estimated savings
$1,800 a year
  • 475W Tier 1 solar panels
  • 5kW power inverter
  • 14 × 475W panels
See the 6.6kW system
Most popular

10kW

Medium homes & small businesses

Estimated starting price
Starts from $10,300
Battery prices start from $4,290
or from around $15/day over 24 months
STC discount included
69 STCs ≈ $2,622
Estimated savings
$2,310 a year
  • 475W Tier 1 solar panels
  • 8–10kW power inverter
  • 21 × 475W panels
See the 10kW system

13.2kW

Larger homes & small businesses

Estimated starting price
Starts from $11,250
Battery prices start from $4,290
or from around $16/day over 24 months
STC discount included
91 STCs ≈ $3,458
Estimated savings
$2,900 a year
  • 475W Tier 1 solar panels
  • 10kW power inverter
  • 28 × 475W panels (13.3kW)
See the 13.2kW system

Included in every Bossley Park install

  • 475W Tier 1 solar panels
  • System design and engineering
  • CEC-accredited installation
  • Grid-connection application lodged
  • Wi-Fi production monitoring
  • Export limit confirmed in writing

What can change your estimate

  • Two-storey or steep roofs
  • Roof type, such as Klip-Lok or terracotta
  • A switchboard upgrade
  • Three-phase connection
  • Panels split across several roof faces
  • An export limit on your connection

Anything that applies to your home is itemised in your written quote before you commit to it.

Prices start from the figures above, fully installed net payable after the federal STC rebate and including GST for metro areas (regional areas subject to freight and travel costs; T&Cs apply). Checked September 2026. STC figures use postcode 2176, 2026 deeming and an assumed $38 per certificate — the discount you receive depends on the certificate market on your installation date. Savings are modelled on typical usage and tariffs and are not a guarantee.

Grid connection

What you can export in Bossley Park

Your distribution network — not your retailer — decides how much solar your Bossley Park home may send back to the grid. If there are two dwellings on the block, the metering decides whether that is one connection or two.

10kW per phase

Flexible exports: eligible customers can export up to 10kW per phase most of the time, with the inverter adjusting automatically when the local network needs it to.

1.5kW

The fixed alternative: choosing a fixed export limit instead caps exports at 1.5kW.

From November 2026

Flexible exports become the default connection option for eligible new and upgraded solar systems.

One property can be two customers

A secondary dwelling with its own meter and its own retail account is a separate customer to the network, even though it shares your driveway. Solar on the main roof cannot supply it, and each connection is assessed on its own terms. This is the detail that decides whether a two-dwelling block needs one system or two, and it is worth confirming from your meter box rather than from memory.

Network rules change and every connection is approved on its own merits — we confirm the limit that applies to your address in writing before install day.

Batteries

Adding a battery in Bossley Park

Home batteries attract two separate incentives. The federal Cheaper Home Batteries Program takes an estimated $3,402 off a 13.5 kWh battery, and NSW’s NSW VPP connection incentive (battery via federal program) can add more on top. Battery prices start from $4,290 fully installed after rebates (incl. GST for metro areas; regional areas subject to freight and travel costs). Already have solar? We check your inverter first — some systems take a battery as they are, others need a hybrid inverter.

≈ $3,402

Estimated federal rebate on 13.5 kWh of usable storage

+ NSW

NSW virtual power plant (VPP) incentive when you connect an eligible battery to a VPP, on top of the federal Cheaper Home Batteries discount. The NSW upfront battery discount ended for installs from 1 July 2025.

Planning an EV?

Size your solar for it now. Our 10kW package comes pre-wired for a battery and an EV charger, so adding one later is a small job rather than a rebuild.

From quote to switch-on

How a Bossley Park install works

  1. Step 1

    Free assessment

    We review your roof, shading, switchboard and a recent power bill — and if there is a second dwelling on the block, we check how it is metered before we design anything.

  2. Step 2

    Written quote

    A quote with the panel layout, inverter and every extra itemised — no surprises later.

  3. Step 3

    Network approval

    We lodge your grid-connection application and confirm your export limit before install day.

  4. Step 4

    Installation

    CEC-accredited electricians install, test and commission the system, then clean up. Terracotta and concrete tiles are lifted and flashed rather than drilled through.

  5. Step 5

    Switch-on

    Your retailer updates the meter and we set up monitoring so you can see every kWh.

Our work

Solar systems we have installed

Every install below is a real Kratos job, with the suburb and month it was completed. As we finish work around Bossley Park, those projects will appear here too.

Kratos Energy’s 5 MW Solar Project in South Australia — South Australia
South AustraliaNov 2026

Kratos Energy’s 5 MW Solar Project in South Australia

Kratos Energy’s 5 MW solar project in South Australia showcases renewable energy infrastructure at scale. Featuring ground-mounted solar arrays and dedicated electrical infrastructure, the project forms part of our commitment to developing large-scale solar opportunities across Australia. The project photographs offer a closer look at the installation—from rows of solar panels to the supporting structures, cabling and electrical equipment behind the system. Project at a Glance Project detail Overview Location South Australia Capacity 5 MW Project category Large-scale solar Installation type Ground-mounted solar photovoltaic system Featured infrastructure Solar arrays, mounting structures, electrical equipment and control panels A Closer Look at the Solar Installation The site features rows of elevated solar panels arranged across open land, with access routes between sections of the installation. Ground-mounted systems allow the array layout to be planned around the site’s terrain, available space and maintenance requirements. The photographs also show the underside of the arrays, including structural supports and cable routing. These less-visible components are an essential part of a solar installation, alongside the panels themselves. Dedicated electrical enclosures and control equipment highlight the infrastructure required to support a project of this scale. Together, the images provide a practical view of the engineering involved in a large-scale solar site. Large-Scale Solar Expertise A solar farm requires coordination across site assessment, engineering, equipment selection, construction and network requirements. Kratos Energy’s large-scale solar services cover solar farm development, engineering and construction support, grid connection coordination, and operational support. We work with landowners, investors and commercial partners to assess opportunities and progress renewable energy projects. Explore our project portfolio to discover more of our solar and battery installations. Discuss Your Next Solar Project Have land suitable for solar development, a commercial energy requirement or a renewable energy project in mind? Contact Kratos Energy to discuss your site, objectives and potential next steps. Call 1300 089 547

What our customers say

“Highly appreciated and recommended. As a customer, you can deal directly with Nessar Khan and his team, ask questions, and receive clear answers for complete peace of mind. Thank you to Nessar and the team.”
Saleem Muhammad · Google review
“Kratos Energy offers different pricing options, allowing customers to choose what suits their needs. The quality of work was absolutely worth it, and the team went above and beyond during our solar installation.”
Sreejit Guha · Google review
Read all reviews
Questions

Bossley Park solar questions

How much do solar panels cost in Bossley Park?

What solar rebate can I get in Bossley Park (2176)?

We have a granny flat. Can one solar system cover both dwellings?

Is a bigger system worth it for a full household?

Who approves a solar connection in Bossley Park?

Do I need council approval for solar in Bossley Park?

Do you install in Edensor Park and St Johns Park too?

Solar near Bossley Park

We install across South West Sydney and the wider NSW service area, including Edensor Park, St Johns Park, Abbotsbury, Greenfield Park, Wakeley.

Get your free solar quote in under 2 minutes.

Tell us a little about your place and we’ll tailor the numbers. Everything in the list below is included, no exceptions.

Free consultation & designNo pushy sales tacticsTransparent pricing25-year warrantyProfessional installation
1300 089 547 [email protected]Serving NSW, Victoria & ACT

Get Your Free Quote

Your information is 100% secure and never shared.