6.6kW
Just right for most family homes
- STC discount included
- 45 STCs ≈ $1,710
- Estimated savings
- $1,800 a year
- 475W Tier 1 solar panels
- 5kW power inverter
- 14 × 475W panels
Solar, batteries and EV chargers for Erskine Park — the whole 2759 postcode. Erskine Park is two jobs in one suburb: brick-and-tile homes on the residential side, and warehouse roofs in the industrial estates south of it. We quote both.
These are estimated starting prices, not fixed quotes. Each package starts from the figure shown for a straightforward installation and already has the federal STC discount for postcode 2759 taken off. What your home actually costs depends on your roof, switchboard and connection — we confirm it in writing after a free assessment.
Just right for most family homes
Medium homes & small businesses
Larger homes & small businesses
Anything that applies to your home is itemised in your written quote before you commit to it.
Prices start from the figures above, fully installed net payable after the federal STC rebate and including GST for metro areas (regional areas subject to freight and travel costs; T&Cs apply). Checked September 2026. STC figures use postcode 2759, 2026 deeming and an assumed $38 per certificate — the discount you receive depends on the certificate market on your installation date. Savings are modelled on typical usage and tariffs and are not a guarantee.
Your distribution network — not your retailer — decides how much solar your Erskine Park property may send back to the grid. The figures below are the residential rules; a commercial connection is assessed on its own.
Flexible exports: eligible customers can export up to 10kW per phase most of the time, with the inverter adjusting automatically when the local network needs it to.
The fixed alternative: choosing a fixed export limit instead caps exports at 1.5kW.
Flexible exports become the default connection option for eligible new and upgraded solar systems.
A warehouse system is not a larger version of the home process. The network assesses the site individually rather than approving it automatically, the paperwork asks for more detail about the switchboard and protection settings, and the timeline is longer. None of it is difficult, but it is the reason we start the application before the panels are ordered rather than after.
Network rules change and every connection is approved on its own merits — we confirm the limit that applies to your address in writing before install day.
South of the houses, Erskine Park is one of Western Sydney's larger logistics and warehousing precincts, and those roofs are close to ideal for solar: big, flat-ish, unshaded, and above a load that runs while the sun is up. If you operate from a shed here, the numbers below are the starting point.
Low–medium commercial energy use
Priced per site — a warehouse roof is quoted after a site visit
Standard commercial & industrial
Priced per site — a warehouse roof is quoted after a site visit
Large commercial applications
Priced per site — a warehouse roof is quoted after a site visit
Savings are modelled on typical commercial usage and tariffs, not a quote. A site in the Erskine Park industrial estates is assessed on its own roof, switchboard, tariff and load profile — larger connections are also assessed individually by the network before approval.
Commercial solar installationHome batteries attract two separate incentives. The federal Cheaper Home Batteries Program takes an estimated $3,402 off a 13.5 kWh battery, and NSW’s NSW VPP connection incentive (battery via federal program) can add more on top. Battery prices start from $4,290 fully installed after rebates (incl. GST for metro areas; regional areas subject to freight and travel costs). Already have solar? We check your inverter first — some systems take a battery as they are, others need a hybrid inverter.
Estimated federal rebate on 13.5 kWh of usable storage
NSW virtual power plant (VPP) incentive when you connect an eligible battery to a VPP, on top of the federal Cheaper Home Batteries discount. The NSW upfront battery discount ended for installs from 1 July 2025.
Size your solar for it now. Our 10kW package comes pre-wired for a battery and an EV charger, so adding one later is a small job rather than a rebuild.
We review your roof, shading, switchboard and a recent power bill. On a tile roof we check the condition of the tiles themselves, because brittle tiles are the one thing that turns a simple install awkward.
A quote with the panel layout, inverter and every extra itemised — no surprises later.
We lodge your grid-connection application and confirm any export limit before install day. A commercial connection is assessed on its own and takes longer, so we start it early.
CEC-accredited electricians install, test and commission the system, then clean up. Tiles are lifted rather than walked on where we can, and any we break are replaced.
Your retailer updates the meter and we set up monitoring so you can see every kWh.
Every install below is a real Kratos job, with the suburb and month it was completed. As we finish work around Erskine Park, those projects will appear here too.

Kratos Energy’s 5 MW solar project in South Australia showcases renewable energy infrastructure at scale. Featuring ground-mounted solar arrays and dedicated electrical infrastructure, the project forms part of our commitment to developing large-scale solar opportunities across Australia. The project photographs offer a closer look at the installation—from rows of solar panels to the supporting structures, cabling and electrical equipment behind the system. Project at a Glance Project detail Overview Location South Australia Capacity 5 MW Project category Large-scale solar Installation type Ground-mounted solar photovoltaic system Featured infrastructure Solar arrays, mounting structures, electrical equipment and control panels A Closer Look at the Solar Installation The site features rows of elevated solar panels arranged across open land, with access routes between sections of the installation. Ground-mounted systems allow the array layout to be planned around the site’s terrain, available space and maintenance requirements. The photographs also show the underside of the arrays, including structural supports and cable routing. These less-visible components are an essential part of a solar installation, alongside the panels themselves. Dedicated electrical enclosures and control equipment highlight the infrastructure required to support a project of this scale. Together, the images provide a practical view of the engineering involved in a large-scale solar site. Large-Scale Solar Expertise A solar farm requires coordination across site assessment, engineering, equipment selection, construction and network requirements. Kratos Energy’s large-scale solar services cover solar farm development, engineering and construction support, grid connection coordination, and operational support. We work with landowners, investors and commercial partners to assess opportunities and progress renewable energy projects. Explore our project portfolio to discover more of our solar and battery installations. Discuss Your Next Solar Project Have land suitable for solar development, a commercial energy requirement or a renewable energy project in mind? Contact Kratos Energy to discuss your site, objectives and potential next steps. Call 1300 089 547
“I'd like to thank Nessar and my neighbour Hasan for doing a wonderful job organising the installation of solar panels on my house. Wei and his team worked incredibly hard, especially since my home is double-storey, making the installation quite challenging. They spent the entire day ensuring everything was completed correctly. I'm very happy with the service.”
“Kratos Energy offers different pricing options, allowing customers to choose what suits their needs. The quality of work was absolutely worth it, and the team went above and beyond during our solar installation.”
We install across Western Sydney and the wider NSW service area.
Tell us a little about your place and we’ll tailor the numbers. Everything in the list below is included, no exceptions.