Kratos Energy
Kratos Energy
1300 089 547Design My Solar Plan
Casula · NSW 2170

Solar panels in Casula

Solar, batteries and EV chargers for Casula, Liverpool, Moorebank, Chipping Norton, Lurnea, Prestons, Hammondville, Warwick Farm and Mount Pritchard — the whole 2170 postcode. The panels go up in a day. What decides when you start being paid for what you export is a meter, and that part belongs to your retailer rather than to us. This page is the sequence, the timeframe and the two things to check on your first bill.

  • 6.6kW systems starting from $7,410 (battery prices start from $4,290)
  • We tell you at quote stage whether your meter needs replacing or reconfiguring
  • What happens after switch-on explained before it happens, not after
Read our customer reviewsCEC-accredited installers

Get a free Casula quote

Your information is 100% secure and never shared.

Solar in Casula at a glance

STC Zone 3
Postcode 2170 sits in Zone 3 (rating 1.382), which sets your rebate
Network approval
We lodge your grid-connection application and confirm your export limit
4.1 kWh
Average daily output per kW of panels in the Sydney region
Liverpool City Council
Most rooftop solar on houses here needs no council approval
Solar prices in Casula

What solar costs in Casula

These are estimated starting prices, not fixed quotes. Each package starts from the figure shown for a straightforward installation and already has the federal STC discount for postcode 2170 taken off. What your home actually costs depends on your roof, switchboard and connection — we confirm it in writing after a free assessment.

6.6kW

Just right for most family homes

Estimated starting price
Starts from $7,410
Battery prices start from $4,290
or from around $11/day over 24 months
STC discount included
45 STCs ≈ $1,710
Estimated savings
$1,800 a year
  • 475W Tier 1 solar panels
  • 5kW power inverter
  • 14 × 475W panels
See the 6.6kW system
Most popular

10kW

Medium homes & small businesses

Estimated starting price
Starts from $10,300
Battery prices start from $4,290
or from around $15/day over 24 months
STC discount included
69 STCs ≈ $2,622
Estimated savings
$2,310 a year
  • 475W Tier 1 solar panels
  • 8–10kW power inverter
  • 21 × 475W panels
See the 10kW system

13.2kW

Larger homes & small businesses

Estimated starting price
Starts from $11,250
Battery prices start from $4,290
or from around $16/day over 24 months
STC discount included
91 STCs ≈ $3,458
Estimated savings
$2,900 a year
  • 475W Tier 1 solar panels
  • 10kW power inverter
  • 28 × 475W panels (13.3kW)
See the 13.2kW system

Included in every Casula install

  • 475W Tier 1 solar panels
  • System design and engineering
  • CEC-accredited installation
  • Grid-connection application lodged
  • Wi-Fi production monitoring
  • Export limit confirmed in writing

What can change your estimate

  • Two-storey or steep roofs
  • Roof type, such as Klip-Lok or terracotta
  • A switchboard upgrade
  • Three-phase connection
  • Panels split across several roof faces
  • An export limit on your connection

Anything that applies to your home is itemised in your written quote before you commit to it.

Prices start from the figures above, fully installed net payable after the federal STC rebate and including GST for metro areas (regional areas subject to freight and travel costs; T&Cs apply). Checked October 2026. STC figures use postcode 2170, 2026 deeming and an assumed $38 per certificate — the discount you receive depends on the certificate market on your installation date. Savings are modelled on typical usage and tariffs and are not a guarantee.

After switch-on

The meter, and why your exports take a few weeks to count

The most common complaint in the month after an install has nothing wrong with the system behind it. The panels work from the moment they are commissioned, and every kilowatt-hour the house uses is already saving money. What has not started is the crediting of what goes out — and that waits on a meter nobody mentioned during the sale.

The installer finishes, the retailer starts

We commission the system, lodge the grid-connection application and send the compliance paperwork through. From there your retailer appoints whoever installs or reconfigures the meter. We cannot do that part, and neither can the network directly — it is a handover between two businesses, which is precisely why it is the step that gets dropped.

Reconfigure or replace

An existing smart meter usually needs only a reconfiguration, often done remotely. An older basic meter cannot separate imported from exported energy at all and has to be physically swapped. We will tell you which one you are facing at quote stage rather than on the day.

20 business days

Where you and your retailer cannot agree a date, the replacement is required within 20 business days — and your feed-in applies from the date that work completes, not from the day the panels went up. If you are past that with nothing to show, the Energy and Water Ombudsman NSW is free and handles exactly this.

Two things to check on the first bill

First: is there a solar export line, with a number of kilowatt-hours beside it? If there is not, the meter has not been configured and that is a call to your retailer, not to your installer. Second: did your tariff change? A new smart meter can be the moment a retailer proposes moving you to time-of-use pricing, which changes the arithmetic of everything above. For a meter installed from 1 December 2025 a retailer cannot change your tariff structure without your consent for two years; one installed before that date does not carry the same protection. You are not obliged to be on time-of-use and flat-rate plans still exist — but it is a decision, and the time to make it is before you agree rather than after a quarter of bills. One last thing: if you are going to change retailers, do it before the install, because switching mid-configuration restarts the paperwork.

Network rules change and every connection is approved on its own merits — we confirm the limit that applies to your address in writing before install day.

And once it is counting, what is it worth?

Getting the meter sorted is what puts the number on the bill. It is worth knowing in advance how small that number is compared with the one next to it — a kilowatt-hour you use in the house is worth several times one you export, which is the single most useful thing to understand about owning solar. Our Bangor page works it through with the figures our own calculators use, and explains why chasing the highest advertised feed-in rate is usually the wrong move.

What a kilowatt-hour is actually worth
Batteries

Adding a battery in Casula

Home batteries attract two separate incentives. The federal Cheaper Home Batteries Program takes an estimated $3,402 off a 13.5 kWh battery, and NSW’s NSW VPP connection incentive (battery via federal program) can add more on top. Battery prices start from $4,290 fully installed after rebates (incl. GST for metro areas; regional areas subject to freight and travel costs). Already have solar? We check your inverter first — some systems take a battery as they are, others need a hybrid inverter.

≈ $3,402

Estimated federal rebate on 13.5 kWh of usable storage

+ NSW

NSW virtual power plant (VPP) incentive when you connect an eligible battery to a VPP, on top of the federal Cheaper Home Batteries discount. The NSW upfront battery discount ended for installs from 1 July 2025.

Planning an EV?

Size your solar for it now. Our 10kW package comes pre-wired for a battery and an EV charger, so adding one later is a small job rather than a rebuild.

From quote to switch-on

How a Casula install works

  1. Step 1

    Free assessment

    We review your roof, shading, switchboard and a recent bill. The bill matters as much as the roof here — it tells us what meter you have and what tariff you are on.

  2. Step 2

    Written quote

    A quote naming the panel and inverter models, the system size, the total price and what is excluded. We will also tell you at this point whether your meter will need replacing or only reconfiguring.

  3. Step 3

    Network approval

    We lodge your grid-connection application and confirm any export limit before install day.

  4. Step 4

    Installation

    Accredited electricians install, test and commission the system, then clean up. The system generates from the moment it is switched on, whatever your meter is doing.

  5. Step 5

    Switch-on, then the meter

    We send the compliance paperwork to your retailer and set up monitoring. Your retailer then arranges the meter work, and your exports start being credited from the date that is finished — we will tell you what to expect rather than letting you discover it on a bill.

Our work

Solar systems we have installed

Every install below is a real Kratos job, with the suburb and month it was completed. As we finish work around Casula, those projects will appear here too.

Kratos Energy’s 5 MW Solar Project in South Australia — South Australia
South AustraliaNov 2026

Kratos Energy’s 5 MW Solar Project in South Australia

Kratos Energy’s 5 MW solar project in South Australia showcases renewable energy infrastructure at scale. Featuring ground-mounted solar arrays and dedicated electrical infrastructure, the project forms part of our commitment to developing large-scale solar opportunities across Australia. The project photographs offer a closer look at the installation—from rows of solar panels to the supporting structures, cabling and electrical equipment behind the system. Project at a Glance Project detail Overview Location South Australia Capacity 5 MW Project category Large-scale solar Installation type Ground-mounted solar photovoltaic system Featured infrastructure Solar arrays, mounting structures, electrical equipment and control panels A Closer Look at the Solar Installation The site features rows of elevated solar panels arranged across open land, with access routes between sections of the installation. Ground-mounted systems allow the array layout to be planned around the site’s terrain, available space and maintenance requirements. The photographs also show the underside of the arrays, including structural supports and cable routing. These less-visible components are an essential part of a solar installation, alongside the panels themselves. Dedicated electrical enclosures and control equipment highlight the infrastructure required to support a project of this scale. Together, the images provide a practical view of the engineering involved in a large-scale solar site. Large-Scale Solar Expertise A solar farm requires coordination across site assessment, engineering, equipment selection, construction and network requirements. Kratos Energy’s large-scale solar services cover solar farm development, engineering and construction support, grid connection coordination, and operational support. We work with landowners, investors and commercial partners to assess opportunities and progress renewable energy projects. Explore our project portfolio to discover more of our solar and battery installations. Discuss Your Next Solar Project Have land suitable for solar development, a commercial energy requirement or a renewable energy project in mind? Contact Kratos Energy to discuss your site, objectives and potential next steps. Call 1300 089 547

What our customers say

“I'm so pleased I chose Kratos Energy after comparing three different providers while building my home. Their pricing, product choices, and installation quality exceeded my expectations.”
Sukhneet Kaur · Google review
“Informative website, excellent workmanship, and a great overall experience. Highly recommended.”
Rumne Khan · Google review
Read all reviews
Questions

Casula solar questions

How much do solar panels cost in Casula?

What solar rebate can I get in Casula (2170)?

My system is on but I am not getting any feed-in credits. What is wrong?

Who actually changes the meter — you, the network, or my retailer?

How long should it take?

My old meter looks like it is running backwards. Is that a good thing?

Will getting a smart meter put me on a time-of-use tariff?

Should I switch retailers before or after the install?

Who approves a solar connection in Casula?

Solar near Casula

We install across South West Sydney and the wider NSW service area, including Liverpool, Moorebank, Chipping Norton, Lurnea, Prestons, Hammondville, Warwick Farm, Mount Pritchard.

Get your free solar quote in under 2 minutes.

Tell us a little about your place and we’ll tailor the numbers. Everything in the list below is included, no exceptions.

Free consultation & designNo pushy sales tacticsTransparent pricing25-year warrantyProfessional installation
1300 089 547 [email protected]Serving NSW, Victoria & ACT

Get Your Free Quote

Your information is 100% secure and never shared.